CEVAHIR SKY CITY
CEVAHIR GROUP - Skopje, Macedonia
Cevahir Sky City Mall
- Project Type: Shopping and Office Center
- Total Construction Area: 70,000 m²
- Start Date: December 2021
- Completion Date: September 2023
- Features: Climate Control and Ventilation System utilizing Daikin VRV Air Conditioning (39 zones) and Systemair Air Handling Units (11 units).
Cevahir Sky City Residences
- Project Type: Residential Complex with 40 Floors and 4 Blocks
- Total Construction Area: 280,000 m²
- Start Date: December 2021
- Completion Date: May 2023
- Features: Heating and Cooling System equipped with Daikin Mini VRV Air Conditioning Units.
Demirören İstiklal AVM
19.000 m2 Closed Construction Area
7.000 m2 Closed Hotel Area
26.000 m2 Total Closed Area
DEMİRÖREN AVM AND HOTEL (sanitary, ventilated, fire, natural gas and heating-cooling installations) part of the production of the material by us by testing and commissioning work has been completed.
Main Contractor: Demirören Grup / TAKSİM GAYRİMENKUL YATIRIMI GELİŞTİRME ve İŞLETMECİLİK A.Ş.
Mechanical Chief Faruk Öner
Emaar Properties
One of the leading companies in the global real estate sector, Emaar Properties continues to pioneer in creating luxurious living spaces with many projects in many fields by ülü firsts ülü and ları bests lüks. The world's tallest building, the Burj Dubai, the world's largest shopping center Dubai Mall, the world's largest man-made marina Dubai Marina and The Address Hotels & Resorts as the crowning achievement with the project Emaar Properties, among which Turkey is also found in 18 countries and continues to invest in 36 markets.
Total 178 units of 12 type villa
Total Closed Area: 98.671m²
Discovery Amount: 7.905,735,81 TL
Created on 8.318.000TL
Heating, Cooling, Natural Gas, Ventilation, Hot-Cold Water Manufacturing all of their products as material completed and delivered.
Main Contractor: YAPI MERKEZİ
Information available for:
Daim ZORALİ OĞLU Project Manager
Faruk ÖNER Mechanical Chief:
EMAAR TURKEY
Project Manager: Ergun Karadeniz
Pendik Marina Ve AVM
A total of 136 acres of land on 55.000 m² Covered Area 750 YACHTS CAPACITY All of the productions of the mechanical exploration of Marina and AVM (on land and at sea) were manufactured and tested and commissioning work was completed.
Main Contractor SAĞLAM İNŞAAT
Project Manager Bülent ÇETİN
Mechanical Chief Ali BADUR
AG Plaza
All installations of the mechanical exploration of the AG plaza (sanitary installation, ventilation, installations, fire installations) were manufactured by the material and testing and commissioning work was completed.
Main Contractor: AG
Project Manager Ali ÖZEN Mechanical Chief Resul REİSLER